Loaded tests of a Class 93 are due to be carried out in May, with the locomotive planned to haul up to 2,000 tonnes over Shap.
Class 93 set for loaded tests hauling up to 2,000 tonnes over Shap
30/04/2025 in Fleet
Loaded tests of a Class 93 are due to be carried out in May, with the locomotive planned to haul up to 2,000 tonnes over Shap.
Login to comment
Comments
No comments have been made yet.